We look forward to seeing you on your next visit to the library. Find a location near you.

Interim remedial measure implementation report, industrial wastewater lagoon, Sacramento Rail Yard, Sacramento, California
(Gov Doc)

Book Cover
Average Rating
Published:
[Sacramento : Dept. of Toxic Substances Control, Region 1, 1995].
Physical Desc:
1 v. (various pagings) : ill. (some folded), maps (some folded) ; 28 cm.
Status:
Central
Description
Description not provided
Also in This Series
Copies
Location
Call Number
Status
Central
Library Use Only
More Like This
More Copies In LINK+
Loading LINK+ Copies...
More Details
Format:
Gov Doc
Language:
English

Notes

General Note
Title from cover.
General Note
"October 1995."
Citations
APA Citation (style guide)

(1995). Interim remedial measure implementation report, industrial wastewater lagoon, Sacramento Rail Yard, Sacramento, California. [Sacramento, Dept. of Toxic Substances Control, Region 1.

Chicago / Turabian - Author Date Citation (style guide)

1995. Interim Remedial Measure Implementation Report, Industrial Wastewater Lagoon, Sacramento Rail Yard, Sacramento, California. [Sacramento, Dept. of Toxic Substances Control, Region 1.

Chicago / Turabian - Humanities Citation (style guide)

Interim Remedial Measure Implementation Report, Industrial Wastewater Lagoon, Sacramento Rail Yard, Sacramento, California. [Sacramento, Dept. of Toxic Substances Control, Region 1, 1995.

MLA Citation (style guide)

Interim Remedial Measure Implementation Report, Industrial Wastewater Lagoon, Sacramento Rail Yard, Sacramento, California. [Sacramento, Dept. of Toxic Substances Control, Region 1, 1995.

Note! Citation formats are based on standards as of July 2022. Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy.
Staff View
Grouped Work ID:
27bbde37-ea2d-ed2e-a052-662d5432e9c8
Go To GroupedWork

Record Information

Last Sierra Extract TimeMar 21, 2024 11:53:07 PM
Last File Modification TimeMar 21, 2024 11:53:49 PM
Last Grouped Work Modification TimeMar 21, 2024 11:53:13 PM

MARC Record

LEADER01455nam 2200337Ia 4500
001ocm33429105 
003OCoLC
00519990306121905.0
008951106s1995    cauab        s000 0 eng d
020 |c $30.00
040 |a JRS|c JRS
043 |a n-us-ca
049 |a JRSA
24500|a Interim remedial measure implementation report, industrial wastewater lagoon, Sacramento Rail Yard, Sacramento, California /|c prepared for Southern Pacific Transportation Company ; prepared by ERM-West, Inc.
24630|a Industrial wastewater lagoon, Sacramento Rail Yard, Sacramento, California
24630|a Sacramento Rail Yard, Sacramento, California
260 |a [Sacramento :|b Dept. of Toxic Substances Control, Region 1,|c 1995]
300 |a 1 v. (various pagings) :|b ill. (some folded), maps (some folded) ;|c 28 cm.
500 |a Title from cover.
500 |a "October 1995."
61020|a Southern Pacific Transportation Company.
650 0|a Sewage lagoons|z California|z Sacramento County.
650 0|a Sewage|x Environmental aspects|z California|z Sacramento County.
651 0|a Sacramento Rail Yard (Sacramento, Calif.)|v Maps.
7102 |a California Environmental Protection Agency.|b Dept. of Toxic Substances Control.
7102 |a ERM-West (Firm)
907 |a .b10249783
930 |a CAD H990 S57 I52r 1995
944 |a JRS
945 |y .i1050297x|i 33029035617562|l cenag|s o|k |u 0|x 0|w 0|v 0|t 3|z 11-09-99|o -
998 |e -|d d |f eng|a cen