Curbside pickup and returns now available at 26 locations. View updated hours of operations here.

Draft negative declaration, expanded initial study for the West El Camino - Unity 115/21 kV distribution substation and overhead 115 kV transmission line
(Gov Doc)

Book Cover
Average Rating
Published:
Sacramento : SMUD, [1991].
Physical Desc:
1 v. (various pagings) : ill., maps, plans ; 28 cm.
Status:
Description
Description not provided
Also in This Series
Copies
Location
Call Number
Status
Central Closed Stacks - Library Use Only
CoSAC Sa123 W517 1992 draft
Check Shelf
More Like This
More Copies In LINK+
Loading LINK+ Copies...
More Details
Format:
Gov Doc
Language:
English

Notes

Bibliography
Includes bibliographical references.
Citations
APA Citation (style guide)

(1991). Draft negative declaration, expanded initial study for the West El Camino - Unity 115/21 kV distribution substation and overhead 115 kV transmission line. Sacramento: SMUD.

Chicago / Turabian - Author Date Citation (style guide)

1991. Draft Negative Declaration, Expanded Initial Study for the West El Camino - Unity 115/21 KV Distribution Substation and Overhead 115 KV Transmission Line. Sacramento: SMUD.

Chicago / Turabian - Humanities Citation (style guide)

Draft Negative Declaration, Expanded Initial Study for the West El Camino - Unity 115/21 KV Distribution Substation and Overhead 115 KV Transmission Line. Sacramento: SMUD, 1991.

MLA Citation (style guide)

Draft Negative Declaration, Expanded Initial Study for the West El Camino - Unity 115/21 KV Distribution Substation and Overhead 115 KV Transmission Line. Sacramento: SMUD, 1991.

Note! Citation formats are based on standards as of July 2010. Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy.
Staff View
Grouped Work ID:
725c5dba-0171-9ecf-56c1-2485b092c6cf
Go To GroupedWork

Record Information

Last Sierra Extract TimeMay 12, 2020 06:14:52 AM
Last File Modification TimeSep 01, 2020 09:50:24 PM
Last Grouped Work Modification TimeSep 01, 2020 09:49:47 PM

MARC Record

LEADER01629nam a2200253 a 4500
00519990315173825.0
008920713s1992    cauabe   b   1000 0 eng d
020 |c $15.00
040 |a CS|c CS
043 |a n-us-ca
24500|a Draft negative declaration, expanded initial study for the West El Camino - Unity 115/21 kV distribution substation and overhead 115 kV transmission line /|c prepared by Sacramento Municiipal Utility District, Land and Environmental Servcies Group, Electric System Design Department.
260 |a Sacramento :|b SMUD,|c [1991]
300 |a 1 v. (various pagings) :|b ill., maps, plans ;|c 28 cm.
504 |a Includes bibliographical references.
650 0|a Environmental impact statements|z California|z Sacramento.
650 0|a West El Camino|x Unity 115/21 kV Distribution Substation and Overhead 115 kV Transmission Line (Sacramento, Calid.)|x Environmental aspects.
710 |a Sacramento Municipal Utility District (Calif.)
7101 |a Sacramento Municipal Utility District (Calif.).|b Electric System Design Dept.
74002|a Negative declaration, expanded initial study for the West El Camino - Unity 115/21 kV distribution substation and overhead 115 kV transmission line.
74002|a West El Camino - Unity 115/21 kV distribution substation and overhead 115 kV transmission line.
907 |a .b1013928x|b 05-12-20|c 11-01-99
998 |a cen|b 06-11-09|c m|d d |e -|f eng|g cau|h 0|i 1
930 |a CoSAC Sa123 W517 1992
945 |a CoSAC Sa123 W517 1992 draft|d  - - |e  - - |3 0|g 1|h  - - |i 33029030640973|j 3|k  - - |l cenaz|o l|p $15.00|q  |r f|s v |t 3|u 0|v 0|w 0|x 0|0 0|1 0|y .i10283481|z 11-08-99