We look forward to seeing you on your next visit to the library. Find a location near you.

Draft negative declaration, expanded initial study for the West El Camino - Unity 115/21 kV distribution substation and overhead 115 kV transmission line

Book Cover
Average Rating
Publisher:
SMUD
Pub. Date:
[1991]
Language:
English
Description
Description Not Provided
Also in This Series
More Like This
More Copies In LINK+
Loading LINK+ Copies...
Staff View

Grouping Information

Grouped Work ID725c5dba-0171-9ecf-56c1-2485b092c6cf
Grouping Titledraft negative declaration expanded initial study for the west el camino unity 115 21 kv distribution substation and overhead 115 kv transmission line
Grouping Authorsacramento municipal utility district
Grouping Categorybook
Grouping LanguageEnglish (eng)
Last Grouping Update2024-04-15 21:04:54PM
Last Indexed2024-04-24 03:01:37AM

Solr Fields

accelerated_reader_point_value
0
accelerated_reader_reading_level
0
author2-role
Sacramento Municipal Utility District (Calif.)
Sacramento Municipal Utility District (Calif.).Electric System Design Dept
available_at_catalog
Central
detailed_location_catalog
Central Closed Stacks - Library Use Only
display_description
format_catalog
Gov Doc
id
725c5dba-0171-9ecf-56c1-2485b092c6cf
itype_catalog
Adult Book Non-Fiction
last_indexed
2024-04-24T10:01:37.781Z
lexile_score
-1
literary_form
Non Fiction
literary_form_full
Non Fiction
local_callnumber_catalog
CoSAC Sa123 W517 1992 draft
owning_library_catalog
Sacramento Public Library
owning_location_catalog
Central
publishDate
1991
publisher
SMUD
recordtype
grouped_work
subject_facet
Environmental impact statements -- California -- Sacramento
West El Camino -- Unity 115/21 kV Distribution Substation and Overhead 115 kV Transmission Line (Sacramento, Calid.) -- Environmental aspects
title_display
Draft negative declaration, expanded initial study for the West El Camino - Unity 115/21 kV distribution substation and overhead 115 kV transmission line
title_full
Draft negative declaration, expanded initial study for the West El Camino - Unity 115/21 kV distribution substation and overhead 115 kV transmission line / prepared by Sacramento Municiipal Utility District, Land and Environmental Servcies Group, Electric System Design Department
title_short
Draft negative declaration, expanded initial study for the West El Camino - Unity 115/21 kV distribution substation and overhead 115 kV transmission line
topic_facet
Environmental aspects
Environmental impact statements
Unity 115/21 kV Distribution Substation and Overhead 115 kV Transmission Line (Sacramento, Calid.)
West El Camino

Solr Details Tables

item_details

Bib IdItem IdShelf LocCall NumFormatFormat CategoryNum CopiesIs Order ItemIs eContenteContent SourceeContent URLDetailed StatusLast CheckinLocation
ils:.b1013928x.i10283481Central Closed Stacks - Library Use OnlyCoSAC Sa123 W517 1992 draft1falsefalseLibrary Use Onlycenaz

record_details

Bib IdFormatFormat CategoryEditionLanguagePublisherPublication DatePhysical DescriptionAbridged
ils:.b1013928xGov DocUnknownEnglishSMUD[1991]1 v. (various pagings) : ill., maps, plans ; 28 cm.

scoping_details_catalog

Bib IdItem IdGrouped StatusStatusLocally OwnedAvailableHoldableBookableIn Library Use OnlyLibrary OwnedHoldable PTypesBookable PTypesLocal Url
ils:.b1013928x.i10283481Library Use OnlyLibrary Use Onlyfalsetruefalsefalsetruetrue