New holds can be placed for curbside pickup locations only. Sacramento Public Library locations remained closed to all but select curbside pickup locations in response to public health recommendations. See the Library Coronavirus Action Plan

Report-- revision 1, siting feasibility of locations for dry storage facility on the INEL that are removed from over the Snake River plain aquifer

Book Cover
Average Rating
Publisher:
Idaho National Engineering Laboratory, ;
Pub. Date:
[1996]
Language:
English
Description
Description Not Provided
Also in This Series
More Like This
More Copies In LINK+
Loading LINK+ Copies...
Staff View

Grouping Information

Grouped Work ID1aa018b9-2621-595b-1097-4212b684d399
Grouping Titlereport revision 1 siting feasibility of locations for dry storage facility on the inel that are remo
Grouping Authorpaul c rizzo associates
Grouping Categorybook
Last Grouping Update2020-07-02 02:38:44AM
Last Indexed2020-08-12 02:38:49AM

Solr Details

accelerated_reader_point_value0
accelerated_reader_reading_level0
author2-rolePaul C. Rizzo Associates.
Westinghouse Electric Corporation.
author_display
available_at_catalogCentral
detailed_location_catalogCentral
display_description
format_catalogBook
format_category_catalogBooks
id1aa018b9-2621-595b-1097-4212b684d399
item_details
Bib IdItem IdShelf LocCall NumFormatFormat CategoryNum CopiesIs Order ItemIs eContenteContent SourceeContent FileeContent URLsubformatDetailed StatusLast CheckinLocationSub-location
ils:.b10391824.i23704238CentralFED E 1.68/5: I 18/REV.11falsefalseLibrary Use Onlycenag
itype_catalogAdult Book Non-Fiction
last_indexed2020-08-12T09:38:49.07Z
lexile_score-1
literary_formNon Fiction
literary_form_fullNon Fiction
local_callnumber_catalogFED E 1.68/5: I 18/REV.1
owning_library_catalogSacramento Public Library
owning_location_catalogCentral
publishDate1996
record_details
Bib IdFormatFormat CategoryEditionLanguagePublisherPublication DatePhysical Description
ils:.b10391824BookBooksEnglishIdaho National Engineering Laboratory, ;[1996]1 v. (various pagings) : ill., maps (some folded) ; 28 cm.
recordtypegrouped_work
scoping_details_catalog
Bib IdItem IdGrouped StatusStatusLocally OwnedAvailableHoldableBookableIn Library Use OnlyLibrary OwnedHoldable PTypesBookable PTypesLocal Url
ils:.b10391824.i23704238Library Use OnlyLibrary Use Onlyfalsetruefalsefalsetruetrue
subject_facetIdaho National Engineering Laboratory -- Sanitation
Radioactive waste sites -- Idaho -- Idaho National Engineering and Environmental Laboratory Region
Spent reactor fuels -- Storage -- Idaho -- Idaho National Engineering and Environmental Laboratory Region
title_displayReport-- revision 1, siting feasibility of locations for dry storage facility on the INEL that are removed from over the Snake River plain aquifer
title_fullReport-- revision 1, siting feasibility of locations for dry storage facility on the INEL that are removed from over the Snake River plain aquifer / Paul C. Rizzo Associates
title_shortReport-- revision 1, siting feasibility of locations for dry storage facility on the INEL that are removed from over the Snake River plain aquifer
topic_facetRadioactive waste sites
Sanitation
Spent reactor fuels
Storage